Precision-engineered metal components for architectural safety and industrial plumbing, defining the standard for modern scaffolding and structural support systems.
Leading the metal fabrication industry with high-performance scaffolding components.
◆ As a premier cup lock Factory, we dominate the manufacturing of BUILDING & SAFETY METAL PRODUCTS, ensuring that every joint and pipe meets rigorous global structural standards for high-rise construction and plumbing.
◆ Our technical edge lies in ADVANCED COLD-FORMED STEEL and precision welding, allowing the cup lock Factory to produce components with unmatched load-bearing capacity and rapid-assembly efficiency.
Three fundamental engineering principles that ensure every product is built for extreme durability.
Utilizing high-grade alloy steel with specific chemical compositions for optimal strength-to-weight ratios.
Designed for rapid assembly and disassembly, reducing labor costs and enhancing site safety.
Rigorous testing protocols to ensure reliability under maximum load and extreme weather conditions.
Quantitative analysis of our production distribution and technical performance benchmarks.
Detailed technical data for our range of scaffolding and plumbing metal components.
| Product Component | Material Grade | Standard Dim. | Wall Thickness | Coating | Max Load |
|---|---|---|---|---|---|
| Vertical Standard | Q345B Alloy Steel | 48.3mm OD | 3.2mm - 4.0mm | Hot-dip Galv. | 25kN |
| Ledger Beam | Q235B / Q345B | 48.3mm OD | 3.2mm | Electro-Galv. | 12kN |
| Diagonal Brace | Q345 Alloy Steel | 48.3mm OD | 3.2mm | Hot-dip Galv. | 18kN |
| Base Jack | Forged Carbon Steel | Dia 50mm | 5.0mm | Oil Painted | 30kN |
| Plumbing Joint | Stainless Steel 304 | Various (1"-4") | 2.5mm | Mill Finish | N/A |
| Steel Plank | Q235 Steel | 230mm Width | 1.5mm | Hot-dip Galv. | 5kN/m |
| Cup-Lock Node | Cast Iron / Steel | 48.3mm Fit | 8.0mm | Galvanized | 15kN |
| Swivel Coupler | Forged Steel | Standard 48mm | N/A | Zn Plated | 6.5kN |
Proven performance across diverse industries.
Deployed 20,000+ cuplock standards for a 60-story mixed-use development, reducing assembly time by 30%.
Supplied heavy-duty galvanized cuplock for refinery tower maintenance in corrosive environments.
Custom cuplock configurations for complex curved ceilings and support structures in transit hubs.
Heavy-load cuplock systems used for temporary formwork of bridge piers across river spans.
Tailored solutions for demanding environments.
Rapid scaffolding setups for high-density residential and commercial building projects.
Heavy-duty structural supports for refinery maintenance and plant expansion.
Precision metal fittings for high-pressure water and gas pipeline networks.
Temporary heavy-load support for bridge formwork and structural reinforcement.
Specialized anti-corrosive scaffolding for port and dock construction projects.
Robust metal framing for shaft supports and industrial ventilation systems.
Every batch of steel undergoes spectral analysis to verify chemical composition and tensile strength before production.
Automatic robotic welding combined with manual ultrasonic inspection ensures zero-leakage and maximum joint strength.
Packaging optimized for maritime transport, featuring reinforced crates and vacuum-sealed moisture barriers.
Our production processes are audited by international bodies to ensure safety and consistency.
Expert answers to common technical and commercial inquiries.
The system allows for rapid assembly without the need for loose couplers, significantly reducing labor time and increasing overall site safety for the cup lock Factory clients.
We employ hot-dip galvanization based on ISO standards, ensuring a thick, uniform zinc layer that protects the steel from harsh industrial and marine environments.
Yes, our engineering team can convert your project blueprints into production-ready files, ensuring custom lengths and specialized fittings meet site requirements.
All our scaffolding products are manufactured in accordance with ISO 9001 and EN 12810 standards, providing verified safety for international construction sites.
Depending on the volume and customization, bulk orders typically ship within 21 to 45 days, with sample validation completed in 7 days.
We provide a comprehensive warranty and a streamlined replacement process. Any defect verified against the original spec is replaced free of charge.
Elevate your construction safety with our certified metal components and precision engineering.
